Living

with Jim and Gayle

February, 2025

All of the house water pipes are run on the outside of the house.  They are encased in black foam insulation and then painted white.
Pipes

After completing the shed, Jim decided to enclose them with wood to make them look better.  He's completed doing the pipes on the back of the house.  I need to paint them.
Pipes

I trimmed the three Mulga Acacia trees.  I was smarter this year and only trimmed one a week so that I could fit the branches into our yard waste can each week.
Tree trimming

I celebrated my birthday with a group of other February-born ladies.  This is becoming a yearly tradition.
Steph, Margo, Gayle..Libby, Jackie, Rayanne


One day we had a cloud rainbow.  It was a complete arc (I could only capture a portion of it).  I have never seen a cloud rainbow.
Rainbow

It was a rough month for Bo.  He had two seizures at the first of the month, within a week of each other.  He then got bloody diarrhea for a week.  At the end of the month, he seems to be doing well again.
Bo


<Previous Month Home Next Month >