Living

with Jim and Gayle

July, 2021

The driveway entry project is basically completed.  Jim ended up doing a lot of the work, including digging out and smoothing the area where the concrete went and taking a load of concrete to the dump.   The contractor at least did a good job of pouring and finishing the concrete.
Jim driveway work

Jim was able to hire a company to cut the curbing.  Our contractor had messed it up so badly that one company refused to touch it.  The City of Richland was unhappy about how it came out but opted to approve it rather than escalate the project into needing to dig up the street.
Curb cutting

Jim used plate compactor to compact the sideyard gravel.
Jim compacting

Jim made a screen for the front door so that we can open it to get a cross breeze in the evenings once it cools down.
Jim screen door

Bo decided to attack the sprinklers.  It's a good thing that it was hot because he was soaked to the skin.  We're not sure if he was playing or trying to save me from them.
Bo sprinklers


My garden is struggling a bit but I have harvested several zucchini, yellow squash, cucumbers, and peppers.  The beets are almost ready to be picked.
Garden

Sleepy Bo.
Bo




<Previous Month Home Next Month >